logo
Send Message
Xian WAGE Traffic Infrastructure Installation Co., Ltd.
Xian WAGE Traffic Infrastructure Installation Co., Ltd.
products
Home /

products

2K Double Component Cold Paint Pushing Scraping Road Line Marking Machine 3-20m/min Spraying Speed

Product Details

Place of Origin: China

Brand Name: WAGE

Certification: EMS, OHSMS

Model Number: HG 20MM II

Document: Product Brochure PDF

Payment & Shipping Terms

Minimum Order Quantity: 1 set

Price: 2400-2600usd per set

Packaging Details: box

Delivery Time: 1 to 3 weeks

Payment Terms: L/C, T/T, Western Union, MoneyGram

Supply Ability: 10 sets per week

Get Best Price
Contact Now
Specifications
Highlight:

Pushing Scraping Road Line Marking Machine

,

3-20m/min Road Line Marking Machine

,

Cold Paint Road Line Marking Machine

Marking Model:
Two Components
Dispenser:
Self Dropping
Paint Cylinder Volume:
60L X2
Glass Cylinder:
25kg
Dimension:
3.5m*1.2m*1.2m
Power Supply:
220V/50HZ
Product Name:
Two Component Road Marking Machine
Spraying Precision:
≤2mm
Spraying Speed:
3-20m/min
Spraying Thickness:
0.2-2mm
Marking Model:
Two Components
Dispenser:
Self Dropping
Paint Cylinder Volume:
60L X2
Glass Cylinder:
25kg
Dimension:
3.5m*1.2m*1.2m
Power Supply:
220V/50HZ
Product Name:
Two Component Road Marking Machine
Spraying Precision:
≤2mm
Spraying Speed:
3-20m/min
Spraying Thickness:
0.2-2mm
Description
2K Double Component Cold Paint Pushing Scraping Road Line Marking Machine 3-20m/min Spraying Speed

pushing Scraping two compoent road marking machine

 

Scraping two compoent road marking machine

new version 2024:

2K Double Component Cold Paint Pushing Scraping Road Line Marking Machine 3-20m/min Spraying Speed 0

old version

 

2K Double Component Cold Paint Pushing Scraping Road Line Marking Machine 3-20m/min Spraying Speed 1

General information:

two-component marking series is divided into spraying and scraping two construction processes, two coatings with the aid of two pumps or two paint barrels after mixing chemical reaction to form marking. Compared with the hot melt marking, the two-component marking construction has the advantages of environmental protection, high wear resistance, good reflectivity, long service life and easy construction.

2K Double Component Cold Paint Pushing Scraping Road Line Marking Machine 3-20m/min Spraying Speed 2

 

HG-20MM-II is to put two kinds of coatings in the same barrel separated. After discharging the coatings from the tank, the coatings are fully stirred by an electric stirring shaft. After mixing in the crossing hopper, the chemical reaction is carried out. Finally, the marking is done through the crossing hopper. Compared with spraying two-component marking, scraping marking has the advantages of thicker marking thickness, longer wear resistance, better reflectivity and more uniform mixing.

 

 

Parameter:

 

  HG-20MM-Ⅱ
Marking mode Double compartment scraping
Agitation speed 650r/min
Glass Micro sphere cylinder capacity 25kg
Spraying system Self dropping
Paint cylinder capacity 60L/ tank x 2个cylinder
Marking thickness 1.2-2.5mm adjustment within ranges
Standard thickness 150mm
Width optional 100/200/300/400/450mm(scoops replacement)
Size (L*W*h) 1200*900*1100mm
Weight 162kg

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Construction:

2K Double Component Cold Paint Pushing Scraping Road Line Marking Machine 3-20m/min Spraying Speed 3

 

Contact:

Rita QU

Xi'an Wage Traffic Infrastructure Installation Co.,LTD
Mail: wagetraffic@hotmail.com Cell/ Whatsapp: +86 15591818803
Add:Room 401, Unit 2, Bilding 2, Shenglong Plaza, Weiyang Road, Xi'an, 710016, Shaanxi, China
Send your inquiry
Please send us your request and we will reply to you as soon as possible.
Send